MCSD - Operational Support Services Center
Construction of a new Centralized Warehouse and Operations Support Services Center, spanning approximately 56,000 square feet. This state-of-the-art facility will be housed within a new concrete tilt-up structure, facilitating high-pile racking, cold and frozen food storage, refrigeration equipment, a comprehensive food cooking and packaging center, a print shop, instructional/educational technology operations, facility offices, staging areas, […]
LOCATION:
OWNER:
ARCHITECT:
MCSD - EV Bus Charging Station
The Electric Vehicle (EV) Bus Charging project was completed as part of an energy service contract with the Merced City School District. The district secured funding through PG&E for energy-related improvements to increase energy efficiency and reduce fossil fuel consumption. The project scope included demolishing the existing bus parking lot, installing underground infrastructure, performing earthwork […]
LOCATION:
OWNER:
ARCHITECT:
Sacramento City College Mohr Hall
The new 28,373 square feet, 2-story Mohr Hall allied health and physical sciences consists of lecture halls, laboratories, and office space. The new building incorporates passive solar features such as deep overhangs and vertical fins to help shield from low sun angles. Just outside the geology lab is an outdoor learning space that incorporates a […]
LOCATION:
OWNER:
ARCHITECT:
William S. Richardson School of Law-Community Legal Outreach Center
Construction of a new 9,100 square foot, 2-story precast concrete building consisting of classrooms, offices and meeting spaces, and connecting bridge to existing Law School. It provides space for the Law School’s existing community outreach programs and clinical programs. LEED Gold Certification: Credits awarded to the Law School to achieve Gold designation included: diversion of […]
LOCATION:
OWNER:
ARCHITECT:
Pleasant Grove Elementary School Modernization
Construction of a new 7,400 square foot administration and kindergarten building with re-designed front parking lot to separate parent and bus drop off, and construction of two new 8,600 square foot classroom buildings with eight classrooms each. It also included HVAC upgrades to an existing 2,300 square foot classroom building, a new fire water tank […]
LOCATION:
OWNER:
ARCHITECT:
Lila Bringhurst Elementary School
The project consisted of construction of a new 98,481 square foot elementary school that supports 1,100 Kindergarten through 5th Grade Students. It involves four buildings, including an administration and kindergarten building, multi-purpose building, and two 2-story classroom buildings. The new elementary school is part of a master plan which includes 111 acres of more than 2,000 […]
LOCATION:
OWNER:
ARCHITECT:
Kohala High School STEM/Science Facility
The new 11,480 square feet STEM/Science facility consists of one general classroom building, one Physical Science classroom building, one Biochemistry classroom building, and one Natural Resources classroom building. The structures are sited to take advantage of prevailing winds and are organized along a covered walkway which also provides access to an entry plaza, outdoor learning lanai, and learning gardens.
LOCATION:
OWNER:
ARCHITECT:
King Kekaulike High School Performing Arts Center
The 20,490 square feet, 415-seat theatre for King Kekaulike High School includes a fully rigged stage with 40 lines sets for scenery, lights, and masking, including curtains, drapes, and tracks. The Center also includes a modular proscenium opening, hydraulic orchestra pit and full back of house amenities with costume and scene shops, dressing and makeup […]
LOCATION:
OWNER:
ARCHITECT:
Joseph Kerr Middle School Modernization
Construction of two separate single story buildings designed by project’s two separate architects under a single contract. The two designs included a 10,850 square foot science building and a 18,050 square foot gymnasium building. It also involved upgrades to existing restrooms, upgrades to existing campus paving, a new access and bus loop, and all associate […]
LOCATION:
OWNER:
ARCHITECT:
James Rutter Middle School, New Science Center
The new 13,200 square foot single story classroom building houses eight science classrooms as well as upgrades to existing student restrooms and to existing campus paving for accessibility. The project also included associated site, landscape work, and construction of new fire water service, and fire access road.
LOCATION:
OWNER:
ARCHITECT:
Golden West Elementary School Modernization
The 8,650 square foot project included a new classroom and administration building, and an addition of a kitchen to existing multipurpose building and modernization of all existing buildings.
LOCATION:
OWNER:
ARCHITECT:
East Franklin Elementary School
Construction of a new 63,518 square foot elementary school that included eight permanent buildings and associated site work. In addition, this project is subject to California Green Building Standards Code and the project complies with Collaborative for High Performance Schools CHPS Verified program.











